News
Rock solid! Maintenance at Little Lake

LITTLE Lakes Committee has just completed scheduled maintenance on Little Lake Boort for 2025.
Contractor Stuart Coutts carried out the works which included just over 1000 tonnes of granitic sand placed along the foreshore of Little Lake Boort adjacent to Lake View Street. 
Sand was also placed on the Myrnong Beach foreshore and the walking track to the Bird Hide. 
Another 50 tonnes of rocks were placed to protect trees from further erosion including a concrete wall at the old yacht club site.
The Lake will be full by Christmas and maintained at this level right through summer when thousands of people will be in Boort for holidays.

Subscribe to Loddon Herald to read the full story.