• Loddon Herald

Determination unchanged

The Resource Manager for northern Victoria today updated the 2021/22 seasonal determinations.

The Murray system increases from 100 per cent of high-reliability water shares (HRWS) and 12 per cent of low-reliability water shares (LRWS) to 100 per cent HRWS and 72 per cent LRWS.

The Goulburn, Campaspe and Loddon systems remain at 100 per cent HRWS.

Seasonal determinations in the Broken and Bullarook systems stay at the maximum possible 100 per cent HRWS and 100 per cent LRWS.

Resource Manager Mark Bailey said resources in the Murray system continued to improve with rainfall since the last assessment.

“Continuing flows into the Menindee Lakes and the upper Murray storages are the basis for today’s improvement,” Dr Bailey said.

“Releases to control the level in Lake Hume during December also contributed, with another 105 gigalitres deducted from spillable water accounts.

“After a short pause due to drier weather, the releases from Lake Hume to manage water levels restarted early in January. This means further deductions from Murray spillable water accounts will occur on February 15 when the volume released is confirmed.”

Dr Bailey said the other northern Victorian systems received smaller resource improvements.

“The Goulburn system needs another 480 gigalitres of water before reserves are sufficient for 2022/23 allocations to high-reliability water shares.”

The Bureau of Meteorology seasonal outlook for the February to April period does not strongly favour above- or below-average rainfall across eastern parts of northern Victoria and favours slightly drier conditions in the west. La Niña conditions continue in the tropical Pacific and are expected to remain until early autumn. La Niña conditions increase the likelihood of above-average rainfall totals in south-east Australia.




4 views0 comments

Recent Posts

See All